Logistic Branch School, Kabul – Afghanistan
This project consists of the site-adapt facilities, and design/build facilities for the Logistics Branch School (LOG School), of the Afghanistan National Army (ANA). There were 16 buildings of different types under this contract with total building area of over 17,000.00SM.
The combined campuses were designed to accommodate approximately 2,200 personnel consisting of students and staff.
Followings were the key deliverables of the projects:
- Master Planning and Design
- Survey & Geotechnical Investigation
- Demining & UXO Removals
- /Headquarters Building AD04
- Administration Building AD 11
- Latrine Building L1
- Laundry Building MS2
- Bridmal & BWT Storage S02
- Barracks
- Classroom Buildings
- Shelter Transportation Inspection (PEB)
- Water System
- Storm Drainage System
- Electrical Works