Design and Construction of ANA Garrison Upgrades, Pole-Charkhi and Darulaman, Kabul-Afghanistan
The project was consists of the design and construction of five (5) Arms Storage Buildings, a (1) Fitness Center, and a (1) Fire Station addition, for Afghan National Army use at Pol-e-Charki Garrison, Afghanistan. The project also had a (1) complete Fire Station at Darualaman, Afghanistan. Both sites were located inside the existing garrison compounds.
Followings were the key deliverables of the projects:
- Master Planning and Design
- Survey & Geotechnical Investigation
- Demining & UXO Removals
- 5 Arms Storage Buildings
- 2 Fire Station Buildings
- 1 Fitness Center Building (PEB)
- Water System
- Storm Drainage System
- Electrical Works